Terrace

Reports

This chapter covers Terrace's reports: one dialog with every report as a live table, from point lists to earthwork, pipes and technical descriptions, plus the quick report commands. By the end you'll be able to preview any report on your project and save it as CSV for a spreadsheet or as a PDF to print and attach.

Opening the Reports dialog

Every report is in one dialog, and you can reach it from wherever you are:

  • Sheets ▸ Reports on the ribbon, or type REPORT (aliases REPORTS, CIVILREPORT).
  • The Reports… button in the Next step panel once the road is designed.
  • The Report… button at the top of an object's Properties, or Report… in an object's menu (⋯) in the Project browser.
  • Surfaces ▸ Surface Report, and Report on the contextual tab of a selected alignment, profile, corridor or surface.
  • The command palette (⌘K): type "reports".
The Reports group of the Sheets tab: a large Reports button, and Stakeout and Earthwork buttons.
The Reports group of the Sheets tab.

When an object is selected (or you start from its Properties), the dialog opens on the first report about that kind of object: Alignment geometry for an alignment, Earthwork volumes for a sample line group, Pipes for a pipe network, Parcel areas for a parcel site. With nothing selected it opens on the Point list.

The dialog

The Reports dialog on the sample project: the list of reports on the left grouped under Survey, Surfaces, Roads, Earthwork and Drainage, and on the right the Point list report with the Point group set to All points, an Only points field, and a table of 2134 points with Northing, Easting, Elevation, Raw and Full Description; Save CSV…, Save PDF…, Copy and Close buttons at the bottom.
The Reports dialog, on the sample's point list.
  1. Pick a report in the list on the left. Reports are grouped by task: Survey, Surfaces, Roads, Earthwork, Drainage and Parcels (scroll the list for the last groups).
  2. Pick what it's about in the first field: the alignment, profile, surface, sample line group, pipe network or parcel site. The first object of the right kind is chosen for you.
  3. Set the options, if the report has any (see the table below).
  4. Read the preview. It follows every change at once: the report's title, the table (the first 300 rows; saving writes them all), the row count, and the report's notes below it.
  5. Save or copy:
    • Save CSV… writes the table as a CSV file for Excel or another spreadsheet.
    • Save PDF… writes a printable PDF (see PDF reports).
    • Copy puts the report on the clipboard as plain text with aligned columns and its notes, ready to paste into an email or a document.

Files are named after the report, for example Technical Description - Lot 3 · San Roque Lots.pdf. A line under the preview confirms each save.

A report reads the project as it is now: change the design, open the dialog again, and the numbers follow.

Every report

GroupReportAboutWhat it showsOptions
SurveyPoint listPoint group, or all pointsPoint number, northing, easting, elevation, raw and full descriptionOnly points: ranges like 1-20, 35
Point groupPoint groupThe group's points, as in the point list, with the group's description—
Traverse adjustment—The project's first traverse: adjusted coordinates of its stations, misclosure and precision—
Least squares adjustment—Adjusted coordinates with their standard errors (σ N, σ E) and error ellipses—
SurfacesSurface statisticsSurfacePoints, triangles, area, elevation range, slopes—
Volumes between surfacesSurfaceCut, fill and net volume and area between two surfaces, with cut and fill factorsCompared with: the other surface
RoadsAlignment geometryAlignmentEach tangent, spiral and curve: stations, length, radius, direction, start and end coordinates; the key points (TS, SC, CS, ST…) and superelevation stations in the notes—
Stakeout along an alignmentAlignmentStation, offset, side, northing, easting and design elevation for setting outEvery (20 m; 50 ft in US projects), Offsets (− left, + right), Also at geometry points (PC, PT…)
Points by station and offsetAlignmentEach COGO point's station, offset and side from the alignmentOnly points
SuperelevationAlignmentFor each curve, the stations of normal crown, level crown, reverse crown and full super, the rate and widening; emax and design speed in the notes—
Profile PVIsProfileEach PVI (point of vertical intersection): station, elevation, grades in and out, A (grade change), curve length and K—
Vertical curvesProfileEach vertical curve: PVC, PVI and PVT stations and elevations, length, grades, A, K, and the high or low point—
Slope stakesCorridorAt each station and side, the catch point (where the cut or fill slope meets the ground) and the other feature points: offset, elevation, distance from the centerline, coordinates—
EarthworkEarthwork volumesSample line groupAt each station, the cut, fill and material areas, the volumes between stations, the cumulative volumes and the mass ordinate—
Mass haulSample line groupFree haul distance and volume, overhaul, borrow, waste, balance points, borrow pits and dump sites—
Quantity takeoffSample line groupDPWH pay items with description, unit and quantity: Item 102 excavation, 104 embankment, 105 subgrade preparation, 107 overhaul, 200 aggregate subbase, 311 PCC pavement…—
DrainagePipesPipe networkEach pipe: from and to structures, size, material, length, slope, inverts, design flow, capacity, velocity, depth and HGL (hydraulic grade line) at both ends—
StructuresPipe networkEach structure: part, coordinates, station and offset, rim, invert, depth, sump, HGL in and out—
CatchmentsPipe networkEach catchment: area, runoff coefficient C, time of concentration Tc and its method, the structure it drains to—
ParcelsParcel areasParcel siteEach lot's number, name, kind, area and perimeter, with the total—
Technical descriptionParcel siteA lot's courses and its technical description in the Philippine form (see Parcels)Lot number, Format
Lot data computationParcel siteA lot's tie line and courses with latitudes, departures and coordinates, and its closureLot number

A few of them on the sample project:

Stakeout along an alignment for Teresa Bypass CL every 20 m with offsets -5,0,5 and geometry points ticked: rows for stations 35+200.00, 35+220.00… at 5.000 L, 0.000 CL and 5.000 R with northings, eastings and elevations; 213 rows; notes say the elevations come from profile Teresa Bypass FG at the centerline.
Stakeout every 20 m at 5 m left, the centerline and 5 m right.

In the stakeout, the side reads L, CL or R and offsets are shown without a sign. Elevations are the design profile's at the centerline, as the note under the table says.

Volumes between surfaces: EG compared with Teresa Bypass Corridor Top: cut 17977.45 m³, fill 16727.77 m³, net -1249.68 m³, area 25256.05 m², cut and fill factors 1.00; the note explains that net = fill - cut.
Volumes between the existing ground and the finished road surface.
Mass haul for Teresa Bypass Sections: free haul distance 600.000 m, free haul volume 10795.47 m³, overhaul volume 4391.56 m³, overhaul 527989.07 m³·m, borrow 0.00, waste 1477.21 m³, balance points at 36+065.81 and 36+346.24; final mass ordinate 1477.21 m³.
Mass haul of the sample's sections.
Quantity takeoff for Teresa Bypass Sections with DPWH pay items: Item 102(2) Surplus Common Excavation 1477.21 cubic meters, Item 311(1) PCC Pavement (Unreinforced) 14306.43 square meters, Item 200(1) Aggregate Subbase Course 2861.29 cubic meters, Item 104(1)a Embankment from Roadway Excavation 16508.09 cubic meters, Item 107(1) Overhaul 527.99 cubic meter-kilometers, Item 105(1) Subgrade Preparation 14306.43 square meters.
Quantity takeoff with DPWH pay items.

The quantity takeoff currently repeats its column headings as the first row of the table; skip that row when you paste it into a bill of quantities.

Quick report commands

For the reports you run most, a command asks for the object, prints the report on the command line (up to 66 lines; the rest is in the dialog) and then opens the Reports dialog. The command line is handy for a quick look while you design.

Command (aliases)Asks forPrints
STAKEOUT (STAKE), also Sheets ▸ StakeoutThe alignment; Station interval <20>; Offsets (comma-separated, + right) <0>, such as -5,0,5Stakeout along the alignment
EARTHWORKREPORT (VOLREPORT), also Sheets ▸ EarthworkThe sample line groupEarthwork volumes
PIPEREPORTThe pipe networkPipes
STRUCTUREREPORTThe pipe networkStructures
ALIGNMENTREPORT (ALREPORT)The alignmentAlignment geometry
AREATABLE (PARCELREPORT)The parcel siteParcel areas
LOTDATA (LDC)A click inside the lotLot data computation
TECHDESC (TD)A click inside the lotThe technical description

At each object prompt, press Enter for the object shown, click one, or type its name. The stakeout interval and offsets are remembered for next time.

Note For now the dialog these commands open shows the first report for the object (for example Alignment geometry after STAKEOUT, Parcel areas after LOTDATA), not the one you asked for. Pick the report in the list and set its options again to save it.

The full list is in the command reference.

PDF reports

Save PDF… lays the report out on A4 pages, portrait, or landscape when the table is wide. Each page has:

  • a header with the project name and number, and the client and location from Project Settings, with the report's name on the right;
  • the report's title and subtitle (what it's about);
  • the table, with numbers right-aligned and the headings repeated on every page; a wide table is fitted to the page width: its headings wrap onto several lines, then the type gets smaller (not below 6.5 pt), then long text wraps in its cell, and a table still too wide is printed in groups of columns, one after another, each with the first column (station, point, pipe…) again;
  • the notes after the table;
  • a footer with the date and Page 1 of 2.
The top of a PDF report, the Lot Data Computation of Lot 1 · San Roque Lots: header with Teresa Bypass Road (Sample Project) (SAMPLE-2026-001) and DPWH Rizal 1st District Engineering Office (sample) · Barangay San Roque, Municipality of Teresa, Province of Rizal; a table of the tie line from BLLM No. 1, Teresa Cadastre and the four courses with latitudes, departures, northings and eastings; a Closure row; notes with the linear error of closure and the area 5618.68 sq.m.
A lot data computation saved as a PDF.

For a technical description saved as PDF, see Parcels.

CSV and copying

The CSV file holds the table: a heading row, then one row per table row, with numbers as shown in the preview (the project's decimals). A report that has no table, such as an empty one, saves its notes instead. Open it in Excel, LibreOffice or Google Sheets.

Copy is the quickest way to get a report into another document: it copies the title, the table as aligned columns of text, and the notes.

Numbers follow Project Settings: units, decimals for distances, elevations, areas and volumes, the station format (35+200.00) and how directions are written. Change them there and every report follows. See Projects and files.